Scope of Work |
Design and construction management of 6800 square foot metal building and foundation on existing sludge drying bed with dewatering screw press equipment, polymer dosing equipment, mechanical, electrical, control, sitework, and office space. The relatively small footprint of the solids handling building replaces several acres of existing sludge drying beds at Magna Water Company’s wastewater treatment facility and eliminates the need for purchase of additional land and construction of additional drying beds as flow to the plant increases. |